Installation of structure for placement of noise absorption panels ONTEX plant.

Activity description:

  • Installation of main structure based on welding in machine structure.
  • Anchoring main posts.
  • Positioning of column separators.
Installation of noise absorption panels ONTEX plant.

Installation of noise absorption panels ONTEX plant.

Activity description: Installation of

Installation of noise absorption panels ONTEX plant.

Activity description:

  • Installation of channels on the perimeter of areas.
  • Positioning of panels and adjustment of special panels.
  • Placement of doors and extractors adjusting panels on site

Integration of DC TOOL torque control tool equipment for ATLAS COPCO company.

Activity description:

  • Maneuver transfer and assembly of structures and controllers.
  • Installation of rails and accessories for the placement of systems and structures.
  • Equipment leveling and harness routing.
Area modifications

Area modifications

Activity description: Area modifications

Area modifications

Activity description:

Area modifications

Electrical Installation and Control

Electrical Installation and Control

Activity description: Electrical Installation

Electrical Installation and Control

Activity description:

Electrical Installation and Control

Compressed air pipes

Compressed air pipes

Activity description: Compressed air

Compressed air pipes

Activity description:

Compressed air pipes

Modification

Modification

Activity description: Modification

Modification

Activity description:

Modification