
Installation of structure for placement of noise absorption panels ONTEX plant.
Activity description: Installation of

Installation of structure for placement of noise absorption panels ONTEX plant.
Activity description:
- Installation of main structure based on welding in machine structure.
- Anchoring main posts.
- Positioning of column separators.


Manufacturing conveyor belts and stairs
Activity description:
Manufacturing conveyor belts and stairs

Integration of DC TOOL torque control tool equipment for ATLAS COPCO company.
Activity description: Maneuver transfer

Integration of DC TOOL torque control tool equipment for ATLAS COPCO company.
Activity description:
- Maneuver transfer and assembly of structures and controllers.
- Installation of rails and accessories for the placement of systems and structures.
- Equipment leveling and harness routing.