![Civil Works](https://smibc.com.mx/wp-content/uploads/2024/02/proy5-3.jpg)
![](https://smibc.com.mx/wp-content/uploads/2024/02/proy5-3.jpg)
Civil Works
Description of the activity:
- Wall construction
- Land leveling
- Lightweight structure construction (drywall // false ceiling)
- Construction of floors and sidewalks
- Finishes
![Installation of noise absorption panels ONTEX plant.](https://smibc.com.mx/wp-content/uploads/2024/02/proy3-2.jpg)
Installation of noise absorption panels ONTEX plant.
Activity description: Installation of
![](https://smibc.com.mx/wp-content/uploads/2024/02/proy3-2.jpg)
Installation of noise absorption panels ONTEX plant.
Activity description:
- Installation of channels on the perimeter of areas.
- Positioning of panels and adjustment of special panels.
- Placement of doors and extractors adjusting panels on site